Absorption Chiller 2500 kW TRM

Project: Absorption Chiller, waste heat recovery 2500 kW at TRM / Hall i. Tirol
Client:  TIGAS Erdgas Tirol GmbH
Country: Austria
Period:  2014-2015
Services: Detail planning, tender engineering
Function: Team leader


Technical data: TRM is one of the world leading companies to produce high quality ductile cast iron for high pressure water pipes. The absorption chiller is using the waste heat on a low temperature level of approx. 45°C to transfer it to a higher level to feed the District heating system between Innsbruck and Wattens.